Headlines > News > JP Aerospace - Away 38 Preflight Testing

JP Aerospace - Away 38 Preflight Testing

Published by Rob on Sat Jun 6, 2009 11:02 am
Share
More share options
Tools

Here is the latest update from JP Aerospace.

We conducted a full duration test of the Away 38 vehicle on Saturday. The vehicle was hung from a pole to simulate hanging from the balloon. The test went really well.

The vehicle carries two small rockets and they were launch from the vehicle as well. There was one problem with the balloon release system we need to chase. The rocket launch boxes are one time use. We’re already made their replacement. We need to switch them out and make a new cable for the video camera controller. After that Away 38 will get another full duration test (without the rocket launches) then will be good to go.

JPA

JPA2

Frames from on board video of the small rockets leaving Away 38 during ground testing.

JPA Blog

Please feel free to discuss this topic further in the forum or chat…

No comments
Start the ball rolling by posting a comment on this article!
Leave a reply
You must be logged in to post a comment.
© 2019 The International Space Fellowship, developed by Gabitasoft Interactive. All Rights Reserved.  Privacy Policy | Terms of Use