Headlines > News > Launch campaign activity moves into full swing for another active year with Ariane 5

Launch campaign activity moves into full swing for another active year with Ariane 5

Published by Klaus Schmidt on Mon Feb 8, 2010 5:03 pm via: Arianespace
Share
More share options
Tools
Tags

(Arianespace) – Arianespace is laying the groundwork for another busy year with its workhorse Ariane 5, as the first mission of 2010 moves into its second phase of preparations and the follow-on flight’s launch vehicle is delivered to French Guiana.

The heavy-lift Ariane 5 ECA for Arianespace’s kick-off mission of 2010 was transferred from the Spaceport’s Launcher Integration Building to the Final Assembly Building this morning, readying it to receive a dual-satellite payload.  

The launcher for this year’s inaugural flight has moved from the Spaceport’s integration building to the final assembly facility

The launcher for this year’s inaugural flight has moved from the Spaceport’s integration building to the final assembly facility

This flight is scheduled for March 24, carrying the ASTRA 3B telecommunications satellite for SES ASTRA, and the German COMSATBw-2 secure military relay platform.

As preparations move forward for the launch, the next flight’s Ariane 5 has arrived in French Guiana aboard the MN Toucan roll-on roll-off transport ship.  After the MN Toucan docked at Pariacabo port on February 2, the launcher elements were transported to the Spaceport, where this vehicle will soon be taking shape in the Launcher Integration Building.

No comments
Start the ball rolling by posting a comment on this article!
Leave a reply
You must be logged in to post a comment.
© 2014 The International Space Fellowship, developed by Gabitasoft Interactive. All Rights Reserved.  Privacy Policy | Terms of Use