(ATK) – Test is a Major Milestone for ATK, NASA on Ares I Program
PROMONTORY, Utah — Alliant Techsystems (NYSE: ATK) Space Systems and NASA will make history on August 25 as the new Ares I five-segment first stage is tested, marking the start of a new era of space exploration.
What: Horizontal ground test firing of Ares I first stage
When: Tuesday, August 25, 2009
Time: 1 p.m. MDT
Where: ATK Space Systems facility in Promontory, Utah
Test Objectives/Background:
- A total of 46 design objectives will be measured through 650 instrument channels
- The Ares I design is based on the design of the space shuttle’s four-segment booster
- The addition of the fifth segment will increase the maximum thrust performance to approximately 3.6 million pounds
- The first stage of Ares I has been under development since 2005, it measures 12 feet in diameter and 154 feet in length.
- The cases have previously flown on the space shuttle, collectively launching 48 missions–including STS-1.

08:20 pm
08:11 pm
Gabitasoft Interactive. All Rights Reserved.